Owners and Guests:
Please be advised that this website provides the most recent update on conditions at Atlantic Terrace (AT). The reviews presently found on the RCI site from individuals are from 2008, 2009 and 2010 and are out-of-date.
The resort presently has all new sliding glass doors installed in every unit. The new doors have helped to keep water out during the severe rains this year. King mattresses have been replaced in all master bedrooms. New couches and sleeper sofas have replaced the older furniture. The front entry has new tile and the building has had new exterior doors installed. New landscaping has been completed around three (3) sides of the building. The parking garage has a new access door for auto entry. Outside bathrooms, in the pool area, have had new tile and new fixtures installed. During maintenance weeks, room interiors will be touched up/ repainted as needed. New flat screen televisions are replacing the older TV’s, as needed. A new generator has been installed, which is computer operated. All stairwell doors have been stripped, primed and painted.
Construction activity continues at AT with concrete repairs on the balconies and new railings being installed. The workers are doing their best to keep inconveniences to a minimum for owners/guests staying in the building. It is hoped that construction will continue on schedule. The pool has remained open throughout this time while the weather has been warm. When the weather gets cooler, the remaining exterior work is expected to be completed on the A and B units.
This major reconstruction project at Atlantic Terrace was approved by the AT Board in October, 2010. The Board and the Management Company (Atlantic Shores Mgmt.) will continue to work for our owners and guests in striving to make Atlantic Terrace your #1 resort destination.
Submitted by: Larry Longman