<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Atlantic Terrace Condo</title>
	<atom:link href="http://atlanticterracecondo.com/feed" rel="self" type="application/rss+xml" />
	<link>http://atlanticterracecondo.com</link>
	<description></description>
	<lastBuildDate>Sun, 29 Jan 2012 19:08:58 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Letter From The President&#8211;January 3, 2012</title>
		<link>http://atlanticterracecondo.com/letter-from-the-president-january-3-2012</link>
		<comments>http://atlanticterracecondo.com/letter-from-the-president-january-3-2012#comments</comments>
		<pubDate>Thu, 19 Jan 2012 20:16:30 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[Letters from the Association President]]></category>

		<guid isPermaLink="false">http://atlanticterracecondo.com/?p=246</guid>
		<description><![CDATA[Dear Atlantic Terrace Owners and Guests, I would like to express my appreciation for everyone&#8217;s patience during these difficult times at Atlantic Terrace.  I know how frustrated some owners have been during the construction/renovation of the building.  The jack-hammering and all inconvenience experienced during this work period, however, was necessary.  I was at the Atlantic [...]]]></description>
			<content:encoded><![CDATA[<p>Dear Atlantic Terrace Owners and Guests,</p>
<p>I would like to express my appreciation for everyone&#8217;s patience during these difficult times at Atlantic Terrace.  I know how frustrated some owners have been during the construction/renovation of the building.  The jack-hammering and all inconvenience experienced during this work period, however, was necessary.  I was at the Atlantic Terrace later October for the annual board meeting and the work that has been completed is impressive. The building is looking much better every day. We have encountered our share of problems and unfortunately, the Engineer has found further deterioration on the building, but as reported it is not major.  Although, we are not complete with the construction, you can definitely see that the building is beginning to shine as the gem we all hope to see revealed.</p>
<p>The newly elected Board of Directors has also been looking at some items that we could renovate/upgrade inside of the rooms which is not a part of the reconstruction process.  These items include such things as kitchen countertops, upgrading the lights to give a more modern feel in the rooms, and renovating bathrooms in each unit.   The installation of Wi-Fi services in the building has been a major concern of owners and guest, and as this publication is underway, so is the installation of Wi-Fi throughout the building. Hopefully by your next visit to Atlantic Terrace it will accessible from your unit.</p>
<p>There have been ongoing communications between the Board of Directors and Management, sharing ideas and brainstorming, thinking of creative ways to update the website.  The website is currently being updated and the Board’s goal is to have monthly construction updates and “What’s Happening” available to our owners.  We want to use the website as a communication tool so that all owners, board members, and the management staff will be kept well informed.   There has also been the creation of committees to investigate possibilities of increasing revenues for the condominium, updating the “current” by-laws, increasing communication between owners, board members, and management.   The committees will also look at adjusting pricing on current HOA (owned by the Association) units that are for sale, for rent, and a new program that we are introducing called “right to use”.  If anyone is interested in contacting the chairpersons involved with the committees, please refer to the committee designation notice located in this newsletter. If anyone has an idea to upgrade the units, please let us know by contacting any of us through our emails (listed on the Atlantic Terrace website) or by informing the Front Desk staff.  We welcome suggestions.</p>
<p>I hope everyone enjoyed a safe and happy holiday season and are looking forward to an enjoyable stay at your Atlantic Terrace Condominium.</p>
<p>Sincerely,</p>
<p>Frank O’Keefe</p>
<p>President, Atlantic Terrace</p>
]]></content:encoded>
			<wfw:commentRss>http://atlanticterracecondo.com/letter-from-the-president-january-3-2012/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>RESORT UPDATE &#8211; OCTOBER, 2011:  CONSTRUCTION</title>
		<link>http://atlanticterracecondo.com/resort-update-october-2011-construction</link>
		<comments>http://atlanticterracecondo.com/resort-update-october-2011-construction#comments</comments>
		<pubDate>Sun, 06 Nov 2011 22:08:26 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://atlanticterracecondo.com/?p=198</guid>
		<description><![CDATA[Owners and Guests: &#160; Please be advised that this website provides the most recent update on conditions at Atlantic Terrace (AT).  The reviews presently found on the RCI site from individuals are from 2008, 2009 and 2010 and are out-of-date. The resort presently has all new sliding glass doors installed in every unit.  The new [...]]]></description>
			<content:encoded><![CDATA[<p>Owners and Guests:</p>
<p>&nbsp;</p>
<p>Please be advised that this website provides the most recent update on conditions at Atlantic Terrace (AT).  The reviews presently found on the RCI site from individuals are from 2008, 2009 and 2010 and are <strong>out-of-date</strong>.</p>
<p>The resort presently has all new sliding glass doors installed in every unit.  The new doors have helped to keep water out during the severe rains this year.  King mattresses have been replaced in all master bedrooms.  New couches and sleeper sofas have replaced the older furniture.  The front entry has new tile and the building has had new exterior doors installed.  New landscaping has been completed around three (3) sides of the building.  The parking garage has a new access door for auto entry.  Outside bathrooms, in the pool area, have had new tile and new fixtures installed.  During maintenance weeks, room interiors will be touched up/ repainted as needed. New flat screen televisions are replacing the older TV’s, as needed.  A new generator has been installed, which is computer operated.  All stairwell doors have been stripped, primed and painted.</p>
<p>Construction activity continues at AT with concrete repairs on the balconies and new railings being installed.  The workers are doing their best to keep inconveniences to a minimum for owners/guests staying in the building.  It is hoped that construction will continue on schedule. The pool has remained open throughout this time while the weather has been warm. When the weather gets cooler, the remaining exterior work is expected to be completed on the A and B units.</p>
<p>This major reconstruction project at Atlantic Terrace was approved by the AT Board in October, 2010.  The Board and the Management Company (Atlantic  Shores Mgmt.) will continue to work for our owners and guests in striving to make Atlantic Terrace your #1 resort destination.</p>
<p>&nbsp;</p>
<p>Submitted by: Larry Longman</p>
<p>Communications Committee</p>
]]></content:encoded>
			<wfw:commentRss>http://atlanticterracecondo.com/resort-update-october-2011-construction/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>*****CONSTRUCTION UPDATE*****APRIL 15, 2011</title>
		<link>http://atlanticterracecondo.com/construction-updateapril-15-2011</link>
		<comments>http://atlanticterracecondo.com/construction-updateapril-15-2011#comments</comments>
		<pubDate>Wed, 20 Apr 2011 17:19:44 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[Construction Updates]]></category>

		<guid isPermaLink="false">http://atlanticterracecondo.com/?p=143</guid>
		<description><![CDATA[All of the balcony doors in the A and B units have been replaced.  There is still some outside finish work to be accomplished on these units.  This will be done during the exterior waterproofing and painting phase The new replacement balcony doors for the C units have been delivered on site. Preliminary work in [...]]]></description>
			<content:encoded><![CDATA[<p>All of the balcony doors in the A and B units have been replaced.  There is still some outside finish work to be accomplished on these units.  This will be done during the exterior waterproofing and painting phase</p>
<p>The new replacement balcony doors for the C units have been delivered on site. Preliminary work in sounding out any structural damage has been completed on all of the C units.  Staging is now completed and installation work has begun.  We apologize for any inconvenience this work and its accompanying noise may cause.</p>
<p>GOOD NEWS!  Daytona Beach has recently experienced what the Weather Channel calls extreme severe weather.  The rain and wind were near torrential.  NOT A SINGLE ONE OF THE NEW DOORS IN THE A AND B UNITS LEAKED !!</p>
]]></content:encoded>
			<wfw:commentRss>http://atlanticterracecondo.com/construction-updateapril-15-2011/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>ATTENTION ALL OWNERS</title>
		<link>http://atlanticterracecondo.com/attention-all-owners</link>
		<comments>http://atlanticterracecondo.com/attention-all-owners#comments</comments>
		<pubDate>Wed, 20 Apr 2011 17:18:43 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[General Information]]></category>
		<category><![CDATA[Letters from the Association President]]></category>

		<guid isPermaLink="false">http://atlanticterracecondo.com/?p=141</guid>
		<description><![CDATA[IF YOU PLAN ON BANKING YOUR WEEK(S) WHETHER SPECIFIC CALENDAR WEEKS OR POINTS, ALL FEES INCLUDING MAINTENANCE, TAXES, AND SPECIAL ASSESSMENT MUST BE PAID TO THE ASSOCIATION FOR THE YEAR YOU ARE BANKING PRIOR TO YOUR BANKING THOSE WEEKS OR POINTS. FOR EXAMPLE, IF YOU ARE PLANNING TO BANK YOUR WEEK(S) FOR 2012, ALL FEES [...]]]></description>
			<content:encoded><![CDATA[<p>IF YOU PLAN ON BANKING YOUR WEEK(S) WHETHER SPECIFIC CALENDAR WEEKS OR POINTS, ALL FEES INCLUDING MAINTENANCE, TAXES, AND SPECIAL ASSESSMENT MUST BE PAID TO THE ASSOCIATION FOR THE YEAR YOU ARE BANKING PRIOR TO YOUR BANKING THOSE WEEKS OR POINTS.</p>
<p>FOR EXAMPLE, IF YOU ARE PLANNING TO BANK YOUR WEEK(S) FOR 2012, ALL FEES FOR THAT YEAR MUST BE PAID PRIOR TO BANKING</p>
]]></content:encoded>
			<wfw:commentRss>http://atlanticterracecondo.com/attention-all-owners/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>**Construction Update Report&#8211;February 7, 2011**</title>
		<link>http://atlanticterracecondo.com/construction-update-report-february-7-2011</link>
		<comments>http://atlanticterracecondo.com/construction-update-report-february-7-2011#comments</comments>
		<pubDate>Tue, 08 Feb 2011 19:16:32 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[Construction Updates]]></category>
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false">http://atlanticterracecondo.com/?p=81</guid>
		<description><![CDATA[*** CONSTRUCTION UPDATE REPORT *** FEBRUARY 7, 2011 As many of you know, the garage gate was severely damaged when someone ran their vehicle into it. The gate could not be repaired.  We were advised by the insurance company that we were not to attempt to replace it before a settlement was made or they [...]]]></description>
			<content:encoded><![CDATA[<p><strong>*** CONSTRUCTION UPDATE REPORT ***</strong></p>
<p><strong>FEBRUARY 7, 2011</strong></p>
<p>As many of you know, the garage gate was severely damaged when someone ran their vehicle into it. The gate could not be repaired.  We were advised by the insurance company that we were not to attempt to replace it before a settlement was made or they would not pay for it.  Once the settlement was made , a new gate and operating mechanism were ordered.  The new gate has now been installed and is in full operation</p>
<p>The emergency power generator failed. When the building was originally constructed some 22 years ago, the contractor apparently installed a used generator.  Replacement  parts are no longer available.  A new generator was ordered and finally shipped from California.  There was a need to transfer the generator to another truck when it reached Atlanta.  During the transfer, the generator was dropped and damaged forcing us to have another new generator manufactured.  This was done.  The generator was successfully shipped, and is now installed and operational.</p>
<p>Replacement of the sliding balcony doors has begun.  The new and improved door assemblies have been installed in the following units.</p>
<p>1A, 1B, 2A, 3A, 3B, 4B,</p>
<p>6A, 6B, 7A, 7B, 8A, 8B</p>
<p>Currently under way</p>
<p>4A, 2B</p>
<p>The remaining A and B units will be completed over the next several weeks as weather and occupancy permits.  Unfortunately, this has not been a simple remove and replace process.  Due to unforeseen ocean front weathering damage to the surrounding entrance structures and uncompleted work by previous contractors, several entrances required two to three days to complete instead of one.  The professional engineer that we engaged to oversee the entire project is making weekly inspections to ensure that all work progresses according to spec and code.</p>
<p>In conjunction with the door replacements there are some minor interior repairs required.  These are being accomplished by our staff as time and occupancy permits.</p>
<p>Painting of the units is also underway. Painting in the following units has been completed</p>
<p>1A, 1B, 2A, 2B, 3B, 4B, 6A</p>
<p>7A, 7B, 7C, 8C</p>
<p>As with all other work, painting will be completed as time and occupancy permits.</p>
<p>Some new sofas and love seats have been received and are in place on the 5<sup>th</sup>, 6<sup>th</sup>, 7<sup>th</sup>, and 8<sup>th</sup> floors.  The remaining furniture should arrive toward the end of February.  Delivery has been delayed by the many snow storms to hit North Carolina where the furniture is manufactured.</p>
<p>Kim and her staff have created a pleasant beach scene between the pool/beach access door and the pool itself.  New post lamps have been installed along the path.</p>
]]></content:encoded>
			<wfw:commentRss>http://atlanticterracecondo.com/construction-update-report-february-7-2011/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Update from the Board &#8211; December 10, 2010</title>
		<link>http://atlanticterracecondo.com/update-from-the-board-december-10-2010</link>
		<comments>http://atlanticterracecondo.com/update-from-the-board-december-10-2010#comments</comments>
		<pubDate>Fri, 10 Dec 2010 21:22:21 +0000</pubDate>
		<dc:creator></dc:creator>
				<category><![CDATA[Letters from the Association President]]></category>
		<category><![CDATA[Update from the Board]]></category>

		<guid isPermaLink="false">http://atlanticterracecondo.com/?p=76</guid>
		<description><![CDATA[Dear Atlantic Terrace Owners and Guests, As 2010 draws to a close, we are all well aware of a few aggravating problems that have concerned the resort over the past year or so.  With this in mind, the Board  entered into a contract with a registered professional engineer who surveyed the building, prepared specifications, solicited [...]]]></description>
			<content:encoded><![CDATA[<p>Dear Atlantic Terrace Owners and Guests,</p>
<p>As 2010 draws to a close, we are all well aware of a few aggravating problems that have concerned the resort over the past year or so.  With this in mind, the Board  entered into a contract with a registered professional engineer who surveyed the building, prepared specifications, solicited bids, reviewed the bids, and made his recommendations. Based on his recommendations, the Board has now entered into a construction contract to accomplish the recommended work.</p>
<p>As part of the contract, all of the balcony doors will be replaced with an American made product with a strong ocean side track record.  All of the balcony railings will be replaced also with product of proven ocean side track record.  The weather and atmospheric damaged concrete areas will be repaired.  New water proofing and slip resistant surfaces will be applied to all balcony decks.  The building exterior will be re-waterproofed and painted.  Other relatively minor repairs and replacements will be made as necessary to the other public areas .  All of this work will be supervised by the professional engineer who designed the project.  The work will be scheduled over a period of time so as to provide as little inconvenience as possible to our owners and guests.</p>
<p>In addition to the construction work, new mattresses will be furnished for each bed in each unit.  New sleep sofas and love seats will be provided for each unit.  Kitchens will be refurbished with new counters and lighting. New track lighting will be installed in all dining areas.  All units will be re-painted.  Many other small touches to spruce up the resort will also come about.</p>
<p>In short, when all is done Atlantic Terrace will shine as never before.</p>
<h3>L. Guy LeVee, President A/T Board of Directors</h3>
<p>﻿</p>
]]></content:encoded>
			<wfw:commentRss>http://atlanticterracecondo.com/update-from-the-board-december-10-2010/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

